UNION CITY · NEWARK · FREMONT · THE BAY AREA
New construction and remodel electrician in the Bay Area
Ground up wiring for new homes and buildings, and the electrical side of kitchens, baths, additions and ADUs. We work off your plans, coordinate with the other trades, and pass inspection without holding up the rest of the job.
Licensed & Insured · CSLB Lic. #1002637 · Builders & Homeowners · Permitted Work

New builds
- Full rough in, service and panel, and final trim out
- Load planning for how the building will actually be used
- Lighting layout room by room rather than a fixture in the middle of each ceiling
- Capacity for EV charging and solar built in now, not retrofitted later
- Permits pulled and inspections scheduled
On a new build the electrical gets decided early and lived with for decades. Where the panel goes, how many circuits the kitchen really needs, whether there is capacity for a charger later. We would rather have that conversation at framing than at drywall.

Remodels and additions
Remodels are harder than new builds, because you are working around what is already there and half of it is behind a finished wall. Kitchens and baths usually need more circuits than the house was built with. Additions almost always raise the question of whether the existing service can carry the extra load.
We will tell you what the existing system can take before you are committed, which is a much better time to find out.
Panel at capacity? That is where it usually starts.

Working with builders
We work with general contractors regularly and we are used to being one trade among several. That means showing up when the schedule says so, leaving the site in a state the next trade can work in, and flagging a problem early instead of at inspection.
If something in the plans is not going to work, you will hear it from us while there is still time to change it.
Commercial build out or tenant improvement?
How it works
-
Call or text us
Tell us about the project and send plans if you have them. If you do not have plans yet, that is fine, earlier is better.
-
Get a straight estimate
We walk the site or review the plans, tell you what the electrical scope really is, and give you a clear price and where we fit in the schedule.
-
We get it done
Rough in, inspection, trim out. We stay in step with the other trades and we do not leave loose ends for the next guy.
See the work
New builds, remodels, and a few jobs where the plans changed halfway through.
Questions we get a lot
Do you work from plans?
Yes. Send them over and we will tell you what the electrical scope looks like and where we see problems. If you do not have plans yet we can walk the space with you instead.
When should I bring an electrician in?
Earlier than most people do. Decisions about the panel location, the service size and the lighting layout are cheap at framing and expensive after drywall.
Do you do ADUs?
Yes. ADUs usually mean a sub panel and sometimes a service upgrade, and the permitting varies by city. We will tell you which one you are looking at.
Can you keep up with our schedule?
That is most of the job on a build. We will tell you honestly what we can commit to rather than agreeing to a date we cannot hold.
Who pulls the permit?
We pull the electrical permit and schedule the inspection. If the GC is handling the overall permit we coordinate with them.
Got plans? Let's talk through them.
Send them over or call and describe the project. We will tell you what the electrical really involves.
Or email losi@mmt-electric.com