UNION CITY · NEWARK · FREMONT · THE BAY AREA

Electrical panel upgrades in Union City and the Bay Area

If your breakers trip every time the AC kicks on, or you are trying to add an EV charger and the panel cannot take it, the panel is the bottleneck. We upgrade panels so your house can handle how you actually use power. Permitted, inspected, and labeled properly when we leave.

Licensed & Insured · CSLB Lic. #1002637 · Free Estimates · Residential & Commercial

Old electrical panel showing signs it needs replacing

Signs your panel is done

Most people call us when something finally breaks. These are the signs that show up before that.

  • Breakers trip often, or the same one keeps going
  • You still have a fuse box instead of breakers
  • Lights dim when the AC or a big appliance starts up
  • The panel is full and there is no room for another circuit
  • You are adding an EV charger, a heat pump, or a hot tub
  • The panel is warm, buzzing, rusted, or smells like something is burning
  • You are buying or selling and the inspector flagged it

Not sure? Call or text us and describe what it is doing. If we can sort it out over the phone we will, and that costs you nothing.

What a panel upgrade with us includes

One crew, start to finish. You are not chasing three different people to get one job closed.

  • A real look at your current panel, your load, and anything you are planning to add

  • Panel replacement with code compliant equipment

  • Service entrance upgrade when the existing service cannot carry the new load

  • Sub panels for garages, additions, shops, and ADUs

  • Breaker sizing matched to the circuits actually running

  • Every circuit labeled, clearly, so the next person is not guessing

  • Permit pulled and inspection coordinated

  • Capacity checked for an EV charger or solar before you need it, not after

Need residential work done at the same time? See what else we handle.

Upgraded electrical panel ready for permit inspection

Permits, inspection, and PG&E

A panel upgrade is permitted work. In Union City that means a permit through the City of Union City Building Division, and an inspection once the work is done. We pull it and we schedule the inspector. You do not chase any of it.

If the job touches the service itself, the meter, the mast, or the drop from the street, that gets coordinated with PG&E. Scheduling that is usually the part that decides how long the whole job takes, so we tell you up front rather than at the end.

Permitted work matters later, not just now. When you sell, unpermitted electricity turns into a negotiation. Doing it right the first time is cheaper than doing it twice.

City of Union City Building Division

How it works

  1. Call or text us

    Tell us what the panel is doing. Photos of the panel and the label inside the door help more than you would think.

  2. Get a straight estimate

    We come look at it. We tell you what the job needs and what it does not, and you get a clear price before anything starts.

  3. We get it done

    Permitted, inspected, labeled, and cleaned up. We do not leave until it is working the way it should.

See the work

Old fuse boxes, full panels, flush mount installs, and a few that other people had already given up on.

  • Old electrical panel with a worn, water-stained door before replacement
  • Low-voltage and network wiring panel built into a closet wall
  • Open wall cavity with new wiring run for a recessed panel
  • Open breaker panel with new circuits wired in

Panel upgrade questions we get a lot

How do I know if I need a panel upgrade?

Breakers tripping often, a fuse box instead of breakers, lights dimming when something big turns on, no room left for a new circuit, or plans to add an EV charger. Any one of those is worth a look. Send us a photo of your panel and the label inside the door and we can usually tell you a lot before we ever drive out.

What size panel do most homes need?

A lot of older Bay Area homes are on 100 amp service, and that was sized for a house that did not have an EV in the driveway or a heat pump on the roof. 200 amp is the normal upgrade for a single family home now. Bigger homes, or homes with a lot of high draw circuits, sometimes need more.

Do I need a permit?

Yes. Panel upgrades are permitted work and they get inspected. We pull the permit and schedule the inspection as part of the job.

Will my power be off?

For part of the day, yes. The old panel has to come out before the new one goes in. We tell you roughly how long that window will be before we start so you can plan around it.

How long does it take?

Most panel upgrades are a single day. If the service entrance is being upgraded too, or there is a sub panel involved, it can run longer. You will know which one you are looking at before we begin.

Can I add an EV charger after?

That is one of the most common reasons people call us in the first place. If a charger is anywhere in your plans, tell us during the estimate and we will size the panel for it now instead of you paying to open it up again later.

What if my power is out right now?

Then this is not a planning conversation, it is an emergency. Call us.

Lights flickering? Breakers tripping?

Call or text and tell us what it is doing. We will tell you straight what it takes.